Corporate

Why Essan?

All hardware, software, mechanical design, and manufacturing processes of our electric vehicle chargers are carried out in-house. From design to final assembly, all stages are developed and controlled by the Essan Electronic Design team. Thanks to our domestic production capabilities, we directly set our quality standards and continuously improve our products. When you have a technical question or need support, you can contact the manufacturer directly and receive fast and solution-oriented support. For us, it's not just about producing devices; it's about providing safe, long-lasting products that we stand behind.

Essan

  • Native Design
  • 5 Years Warranty
  • Own Production
  • Custom Project Solution
  • ___main.strings.directManufacturerSupport___

Standard Products

  • Imported
  • 1-2 Years Warranty
  • External Supply
  • Standard Product

Products

Track your energy consumption in detail on an annual, monthly and periodic basis; increase efficiency, reduce costs.

Featured Features

Track your energy consumption in detail on a yearly, monthly, and periodic basis; increase efficiency and reduce costs. With Essan smart charging stations, you stay in control and keep the savings in your pocket!

Various Power Options

Various Power Options

Various power options ranging from 3,5 kW to 22 kW.

Infrastructure Support

Infrastructure Support

Single-phase and three-phase infrastructure support

Domestic Design and Production

Domestic Design and Production

All our products are manufactured at Essan Elektronik Tasarım facilities in Eskişehir.

5-Year Warranty Guarantee

5-Year Warranty Guarantee

All Essan charging stations are covered by a 5-year warranty.

Protection

Protection

Advanced protection systems

Long-lasting

Long-lasting

Durable and long-lasting body structure.

Solutions Suitable for Home and Office Use

Solutions Suitable for Home and Office Use

Solutions suitable for different vehicle types and usage needs.

Custom Production and Flexible Structure

Custom Production and Flexible Structure

Hardware and software development processes are carried out entirely by our company, specifically tailored to each project.

How Does the Process Work?

How Does the Essan Process Work from Project to Installation?

Needs Analysis1

Needs Analysis

We determine the most suitable solution by analyzing your usage area and existing electrical infrastructure.
Selecting the Appropriate Device2

Selecting the Appropriate Device

We recommend the most efficient charger based on your power needs and usage scenario.
Free Electrical Infrastructure Survey3

Free Electrical Infrastructure Survey

We provide free on-site inspection services with expert electrical teams that we dispatch.
Installation Support4

Installation Support

We provide technical support during the assembly and commissioning process to ensure a smooth installation.
5-Year Warranty & Support5

5-Year Warranty & Support

All Essan devices are covered by a 5-year warranty and are guaranteed with after-sales technical support.

Documents & Certificates

Essan Elektronik Tasarım products are manufactured in accordance with the applicable safety and quality standards.

CE Conformity Certificate
How Is Electric Vehicle Charging Time Calculated?

How Is Electric Vehicle Charging Time Calculated?

A simple formula is used to calculate the charging time of your electric vehicle (AC charging):

Charging Time=Battery Capacity (kWh)/Charging Power (kW)

For example, a Togg model with an 88 kWh battery will theoretically charge in approximately 4 hours with a 22 kW Essan AC charger.

88 ÷ 22 ≈ 4 hours

Since the charging speed will decrease after the battery charge level reaches 85%, approximately 20-30 minutes can be added to the total time.

The stated times are average values; the actual charging time may vary depending on the vehicle and infrastructure conditions.

Calculate Charging Time

References

Essan Electronic Design products are manufactured in accordance with current safety and quality standards.
Support LineSupport LineCalculate Charging TimeCalculate Charging Time